A multi-passage rotary union RFQ should describe what each passage carries and when it operates. Pair a passage schedule with a machine-state duty matrix so the supplier can review simultaneous pressure, flow, temperature and rotation conditions. For an integrated assembly, add a separate electrical circuit schedule and identify the mechanical interfaces shared by both systems.
This checklist helps system engineers turn a machine requirement into a reviewable enquiry. It does not select a seal material, establish a product rating or prescribe a pressure test. For the wider selection process, use the integrated rotary joint selection guide.
Give every fluid passage a stable identifier and a defined machine function before asking for a configuration. Connect that identifier to both stationary and rotating ports, the destination component and the relevant schematic. A passage count alone leaves important questions unanswered: which services must remain independent, which operate together, and which connections belong to supply, return or an approved drain arrangement?
Start with the fluid schematic, rather than copying the port count from a catalogue illustration. Record the proposed function of each path and ask the supplier to confirm how that function maps to the offered assembly. Do not assume that a spare-looking connection is another working passage or that a drain can be reassigned as a service port.
Keep the same identifiers on the enquiry, schematic, interface drawing and later acceptance record. If the supplier uses different port labels, include a mapping between the two systems. This makes it possible to review a proposed change without silently moving a machine service to the wrong connection.
| RFQ item | What to record | What closes the review |
|---|---|---|
| Passage identity | Machine function, path identifier and both connection labels | Agreed schematic and port mapping |
| Medium | Fluid or gas identity, composition and relevant conditioning | Supplier compatibility response for the actual medium |
| Pressure and flow | Operating states, reference locations and required flow basis | Confirmed operating envelope and passage sizing basis |
| Temperature | Medium and local ambient conditions, including transitions | Reviewed conditions for the offered configuration |
| Rotation | Speed profile, direction, starts, stops and dwell periods | Agreed duty matrix and restrictions |
| Integrated services | Electrical circuit schedule and shared interfaces | Configuration drawing and responsibility boundaries |
| Open assumptions | Missing data, owner and expected confirmation date | Written resolution or explicit quotation exclusion |
For example, a proposed indexing machine may require separate paths for an actuator supply and its return. The useful enquiry identifies the actual schematic functions; it does not conclude that a particular passage arrangement is suitable merely because two connections are available. The machine designer and supplier must agree the topology.
Record pressure and flow against a named medium and operating state, with the measurement or specification reference made explicit. A supply pressure without the required downstream flow cannot describe the whole transfer requirement. Likewise, a flow figure is ambiguous if the medium, temperature and reporting basis are missing. Ask the supplier to review the combination, not isolated maximum values.
Label each entry as a design requirement, measured observation or estimate. Include units and the source of the value. For pressure, identify whether the figure is gauge or absolute and where it applies. For gas flow, state the reference conditions or standard-volume convention used. For liquids, identify the actual fluid and relevant temperature range rather than relying on a broad label such as oil.
Specify the conditions the downstream device needs. If pressure loss through the rotating interface affects that function, provide the available pressure budget and request the supplier's sizing basis. Do not invent a generic allowable loss or treat connection thread size as proof of internal flow capacity.
The DSTI rotary union selector separates media type, passage count, pressure, speed and passage size. These are useful categories for an enquiry, but a catalogue filter result is only an initial candidate. It does not establish that every listed limit is available simultaneously in the required configuration.
Include cleaning, purging, standby and other relevant machine states when their medium or conditions differ from production. State whether an alternative fluid is a genuine requirement or only a proposed option. A supplier should not need to infer a cleaning exposure from the machine's industry label.
Where data is missing, provide an owner and a confirmation action. An unresolved medium identity is more useful when visible than when replaced with a plausible guess. Ask which missing inputs prevent selection and which can remain explicit quotation assumptions until the design is developed.
A duty matrix shows which passage conditions coincide with rotation, dwell and transitions. Use one row for each relevant machine state and relate it to the passage schedule. Record duration, repetition and the services active in that state. This prevents a collection of individual peak values from being mistaken for either a realistic simultaneous duty or a complete operating specification.
A proposed sequence might include loading, clamping, indexing, processing and unloading. Those names are illustrative; use the actual machine sequence and interlocks. During each state, identify whether the assembly rotates, reverses or remains stationary, and whether each service is flowing, holding pressure, isolated or otherwise controlled by the approved machine design.
Treat state transitions as explicit review items. A short event may be important even when it contributes little to an average duty figure. Ask the machine controls owner to identify relevant timing, sequencing and possible overlaps rather than filling them in from assumptions about how a rotary table normally operates.
The operating notes on an official DSTI rotary union listing qualify specifications by combined application conditions and relate operating life to speed and duty. The useful lesson for an RFQ is to disclose the actual duty; those product-specific notes do not supply a rating for another manufacturer's assembly.
For a machine with several recipes, describe the cases that bound the proposed operating envelope. Identify who selected those cases and what changes would require review. Avoid presenting an unverified worst-case combination as an actual machine condition, but do not omit a possible combination simply because it is uncommon.
An integrated rotary union RFQ needs coordinated fluid, electrical and mechanical documents. Keep the electrical circuit schedule separate from the fluid passage schedule, then cross-reference the shared assembly and duty states. The review should establish space, support, connection access and service routing, while leaving the detailed internal arrangement and allowable combined performance to the supplier's confirmed configuration.
Show the mounting interfaces, available envelope, shaft relationship and the parts supplied by each party. Identify whether brackets, fittings, hoses, connectors or protective covers are included in the requested scope. A quotation can otherwise describe a complete rotating component while leaving essential machine-side integration work unassigned.
Document hose and cable routing constraints, connection access and maintenance clearance. Where external forces may reach the assembly, ask the responsible designer to provide the loads and the supplier to confirm the allowable interface conditions. Avoid substituting a generic mounting sketch for an approved installation arrangement.
Electrical requirements should identify circuits and intended functions, voltage and current requirements, signal types, and any relevant operating-state relationship. Listing a communication protocol alone does not demonstrate that an integrated configuration meets the machine's communication requirements. Define the evidence and acceptance work needed without promising that any combination is already available.
Release the RFQ when the passage schedule, duty matrix and interface documents describe the same revision of the machine. Each open question should have an owner and a stated effect on selection or quotation. Request a supplier response that identifies the offered configuration, deviations and remaining assumptions, so commercial comparison rests on the same technical scope.
Before sending the enquiry, check that:
Keep the supplier's response with the enquiry revision it answers. If a machine change affects a passage, medium, duty state or interface, ask for a revised review rather than assuming the original quotation still applies. This is particularly useful when procurement starts before the controls and mechanical design are fully frozen.
To discuss an integrated rotary joint application with JINPAT, prepare the passage schedule, duty matrix, electrical circuit list and interface drawings. Request an engineering review of that documented configuration and ask which assumptions must be resolved before a product recommendation or quotation can be finalised.